Construction Milestone Reached on Swindon’s Mega Logistics Hub at Former Honda Site
Construction is progressing rapidly on a substantial 545,000 sq ft logistics and industrial scheme at Panattoni Park in Swindon, located on the former Honda manufacturing site. McLaren Construction is on track to complete the project within its 39-week schedule, marking a significant step in the regeneration of the area.
Key Takeaways
- Construction is on schedule for the 545,000 sq ft logistics facility at the former Honda site in Swindon.
- McLaren Construction is managing the design and build contract, aiming for completion in early 2026.
- The development targets high environmental standards, including BREEAM ‘Outstanding’ and net-zero upfront carbon emissions.
- The project is part of Panattoni’s broader plan to revitalize the site and create thousands of jobs.
Project Progress and Features
McLaren Construction has reported significant progress on the Panattoni Park development. The steel frame is now complete, with internal roofing largely finished and windows being installed. Cladding installation is also advancing steadily. Externally, concrete slab works for the multi-story car park are complete, and kerbs, power, and water services are being installed. The office area is fully glazed, and the link bridge connecting it to the car park is undergoing cladding.
Upon completion, the facility will offer extensive logistics space complemented by two storeys of high-specification office accommodation and a decked car park. The scheme is designed with a strong focus on environmental performance, targeting BREEAM ‘Outstanding’ and EPC A+/A ratings, with a commitment to achieving net-zero upfront carbon emissions.
Site History and Regeneration
The 370-acre site, historically a brownfield location and a World War II airfield, was redeveloped for car manufacturing by Honda in the late 20th century. Honda ceased operations at the Swindon plant in 2021, leading to the loss of approximately 3,500 jobs. Panattoni’s acquisition and subsequent redevelopment plan aim to breathe new life into the area, creating an estimated 7,000 jobs.
Collaboration and Future Outlook
McLaren Construction is working in collaboration with UMC Architects, KAM Project Consultants, BWB Consulting, and Construction CDM Services on this flagship project. Luke Arnold, regional director at McLaren Midlands & North, expressed pride in the project’s pace and high standards, emphasizing its importance for both Panattoni and the wider region. Panattoni Park Swindon is poised to become a key logistics hub in the South West, offering high-quality industrial space with excellent connectivity.
Sources
- Construction target set to be met for huge logistics scheme at former Honda site, TheBusinessDesk.com.
- McLaren Construction appointed to build huge unit at Swindon’s Panattoni Park, Business Biscuit.
- Major industrial scheme under way at former Honda factory site in Swindon, Business Live.
- What’s that huge metal structure taking shape near the M4 at the old Honda site?, Gloucestershire Live.
- Construction firm appointed to build part of Panattoni Park, Swindon Advertiser.


